Other Fees

Additional Fees and Charges

Fees are established to recover the agency's cost of providing the services requested or performed for an individual or because of an individual’s actions.

I. Customer Service & Administrative Rates & Fees

Rate/Fee Type Amount / Basis Methodology/Notes
Late Fee
(1st Reminder)
$5.00
Late Fee
(2nd Reminder)
$10.00
Call-Out
Fee (Pending Shut-Off Notice)
$0.00
(Courtesy)
Call-Out
Fee (Shut-Off)
$40.00
After-Hours
Turn-On
$250.00 Except in circumstances determined by Sunrise to warrant otherwise, service restoration is not available between 9:00 pm and 8:00 am.
Meter
Tampering Fee
$300.00* *Plus, additional cost as assessed by Sunrise.
Voluntary
Meter Removal/Reinstallation
Variable Removal Fee Estimate Methodology:
Fully burdened hourly labor rate multiplied by projected labor hours, plus other estimated costs;Reinstallation Fee Estimate Methodology:
Recovery of equivalent service charges pursuant to Policy 29-12, plus the fully burdened hourly labor rate multiplied by projected labor hours, plus other estimated costs.
Returned
Payment (NSF, Declined, Returned, etc.)
$35.00* *Additional fees, charges, costs, and corrective actions as determined necessary.
Public
Records Request
Variable Sunrise provides one-half hour staff time and up to 10-pages printing and mailing costs per requester, per request before implementing the fee schedule (For purposes of fee assessment, Sunrise may treat multiple requests from the same requester concerning the same subject matter as a single public records
request.)Fee Schedule Methodology:
fully burdened hourly rate x labor hours plus $0.25/page photocopies (sizes up to and including 11”x17”) plus all other reimbursable costs incurred.

II. Construction & Temporary Services Rates & Fees

Rate/Fee Type Amount / Basis Methodology/Notes
Hydrant
Meter Deposit
$2,000.00 Refundable upon return in good condition, less any applicable charges for damage, repair, replacement, or outstanding fees.
Hydrant
Water
Per Current
Tier 1 Rate (Non-Res); per 1,000/gallons
1 unit = 1,000 gallons

Hydrant Water is non-potable, not available for resale (wholesale)

Monthly Hydrant
Meter Rental Fee
$100.00 Monthly rate; non-prorated
Temp
Construction Office Water Service Installation
Option 1:
Year 1 Fee $500, Year 2 & forward Fee equal to annualized total service charge for equivalent
meter size.

Option 2:
Full SDC and installation charges

Option 1 incurs lump sum use fees (no SDC
credit),Option 2 incurs a full SDC and installation
costs along with monthly service and consumption charges.
Temporary
Irrigation
Variable:
Installation costs (per published schedule);Abandonment
fee (per fee estimate methodology)
Installation costs pursuant to published applicable sized meter install charge; plus, removal/abandonment.

Fee Estimate Methodology:
3.0 x Projected Raw Hourly Wage x Projected Labor Hours plus other estimated costs (non-refundable abandonment fee is applicable toward SDC should permanent service be elected).

Temporary water service shall not exceed thirty-six (36) months from the date of installation.

Maintenance
Bond
25% of
Project Water Infrastructure Costs
Maintenance Bond secured via surety bond or cash deposit in-lieu of bond. Associated with the development of subdivisions, etc.

III. Infrastructure & Development Rates & Fees

Rate/Fee Type Amount / Basis Methodology/Notes
Plan Review Fee
Estimate
Fee Estimate Methodology:
3.0 x Projected Raw Hourly Wage x Projected Labor
Hours
Inspection
Fee
Fee
Estimate
Fee Estimate Methodology:
3.0 x Projected Raw Hourly Wage x Projected Labor
Hours
As-Built
Doc Fee
Variable Reimbursable Costs (passthrough only)
Dig-in Fee Fee
Estimate
Fee Estimate Methodology:
3.0 x Projected Raw Hourly Wage x Projected Labor
Hours plus other estimated costs (i.e., traffic control, paving, boring,
etc.)
Meter
Box & Other Water System Related Replacements
Fee Estimate Fee Estimate Methodology:
3.0 x Projected Raw Hourly Wage x Projected Labor Hours plus other estimated costs (i.e., equipment, materials, supplies, etc.)

IV. Other Miscellaneous Rates & Fees

Rate/Fee Type Amount / Basis Methodology/Notes
Other Misc Rates and Fees (not
otherwise defined in tables I, II, III)
TBD Other misc. rates & fees not listed in tables I, II, III will be assessed and calculated per the following order of precedent methodology(ies): Consideration to all applicable legal requirements and current approved policies, rules, regulations, resolutions, ordinances, etc. Absent an approved documented calculation methodology, Sunrise’s Executive Director and/or delegate will define the appropriate methodology calculation.