Posts Tagged ‘Past’
SCOTT MOUNTAIN SUBDIVISION WATER MAIN REPLACEMENT
Estimated Cost: $500,000 Replace 1,700 feet of corroded Class 50 ductile iron main with properly bedded Class 52 ductile iron main. Schedule: To be determined.
Read MoreAMERON HEIGHTS WATER MAIN REPLACEMENT
Estimated Cost: $600,000 Replace 4,100 feet of corroded 6″ ductile iron main & 250 feet of 4″ PVC with properly bedded 6″ Class 52 ductile iron main. Schedule: To be…
Read MoreREPLACEMENT OF 10″ CAST IRON MAIN IN BOY SCOUT LODGE ROAD
Cost: $350,000 Replaced 1200 feet of 10″ cast iron main to Reservoir 4 with 12″ ductile iron pipe. Completed: July 2018
Read MoreHIGHWAY 212 CAST IRON ABANDONMENT PROJECT
Cost: $700,000 Abandoned 8-inch cast iron main that was prone to breaking in the Damascus area between SE Wiese Rd and SE 222nd Ave. Moved water services over to a…
Read MorePAGE PARK COURT 8” WATER LINE RELOCATION
Cost: $40,000 Relocated 500 feet of 8″ ductile iron main. Completed: February 2020
Read MoreCRW/SWA 152ND AVE RESERVOIR PROJECT
Sunrise’s Cost: $4.9 million Partnership with CRW to construct a 6 million gallon, concrete wire wrapped tank. Sunrise share is 1/3 of the reservoir. Completed: June 2020
Read MoreSE 129TH 4” MAIN REPLACEMENT
Cost: $40,000 Constructed a new 6” ductile water main, replacing an aging 4” cast iron water main prior to the City repaving the road. Completed: July 2020
Read MoreNEW OFFICE AND OPERATIONS FACILITY
Estimated Cost: $15 million Design and construct a new office and operations center. The agency has outgrown the current facility which is located in the heart of residential zoning. The…
Read MoreSUNRIDGE PNEUMATIC PRESSURE ZONE REHAB
Estimated Cost: $100,000 Design and construct an upgraded pneumatic system and add back-up power. The current system is outdated and is approaching the end of its useful life. The new…
Read MoreRESERVOIR 11
Estimated Cost: $8.2 million Constructing a 3 million gallon, concrete wire-wrapped cylindrical tank at 147th Ave and Faris St. Provides much needed storage for Sunrise’s largest service level. Construction: April…
Read More